TTS Martin offer of 29 480 810,84 € was evaluated as the best in public tender for ecologization of Martin heating plant. Contract with purchaser was signed during last days before Christmas and TTS Martin has become a general contractor of works which include installation of 4 hot-water boilers Bosch with unit power of 14,3 MW in reconstructed building and installation of 3 cogeneration units Martin Power with unit electric power 9,34 MW in newly built cogeneration hall.

Total installed electric power therefore will be 28 MW and thermal power even 80 MW. Cogeneration units will be driven by generating sets Rolls Royce B35:40V20AG2 from Norwegian producer Bergen Engines. They are spark-ignited natural gas engines with electric efficiency over 48% which will be equipped by heat extraction module for maximal energy usage from fuel and by emission reduction system to achieve newest emission limits. This investment will allow to completely switch off the coal combustion in Martin heating plant since 2019/20 heating season and to produce the heat and power in the most modern ecologic and economic way.